The 1,200 sq ft outlet’s modern layout took Grov Design studios one and a half month to conceptualize and a further two and a half months to complete the relevant works that included wet works, wiring, painting, partitioning, plaster ceiling, air-conditioning, carpentry, floorboard, furniture, and signage.
/idmalaysia/images/arrow-ID-30a2b074-c048-4d11-8eda-17d7b883b183.png)
/idmalaysia/images/id-fav-ID-27d7a84a-8ccc-4b78-e4f5-2899e4eb4e09.png)